FAQS

We recommend contacting your local council as requirements vary.

Absolutely, we would recommend that you do. You will need to provide us with the measurements of your chosen doors/windows so we can customise the pod building to suit.

Yes, contact us and we can organise a quote.

Allow up to 5-6 weeks after payment as all buildings are made to order​.

We can provide you with contacts from erection to full fit out in selected areas. Contact us for more details

Yes we supply engineering drawings with our pods.

The buildings come with roof blanket insulation and wall sarking. We recommend installing wall insulation to improve the thermal efficiency.

No, our pods come with their own flooring system. They can also be installed on an existing slab if required.

All buildings come with detailed assembly instructions. Any person with DIY experience will be able to install them.

Contact us and we can make arrangements for you to look at our display pod